 |
Photo of
Southeast Corner of Pit N after the Collapse of the South Wall. (Need to
rotate?) at the Sandon Site, Summer Field School 1997 |
 |
Photo of
Southeast Corner of Pit N after the Collapse of the South Wall at the Sandon
Site, Summer Field School 1997 |
 |
A View of
the Collapse of the South Wall of Pit N Taken from Above - Ladder for Scale at
the Sandon Site, Summer Field School 1997 |
 |
Stephanie
Records the Specifics of the Collapse in Pit N at the Sandon Site, Summer Field
School 1997 |
 |
Sandy,
Anna, Stephanie and Neil Screening Material from Pit N While Sheryl Works
Inside the Pit and Richard Takes Notes on our Progress at the Sandon Site,
Summer Field School 1997 |
 |
Another
View of the Work Being Done on Pit N by Sandy, Anna, Stephanie, Sheryl and
Richard at the Sandon Site, Summer Field School 1997 |
 |
View from
Above of the Progress Made by Mike in Pit N at the Sandon Site, Summer Field
School 1997 |
 |
View from
Above of the Progress Made by Mike in Pit N at the Sandon Site, Summer Field
School 1997 |
 |
View from
Above of the Progress Made by Mike in Pit N with Meter Stick to the Left
for Scale at the Sandon Site, Summer Field School 1997 |
 |
Sandon Image # 100 - Mike cleans the wall
of Pit N so that Sheryl can construct a profile map at the Sandon Site, Summer
Field School 1997 |
 |
Mike Takes
a Measurement Reading in Pit N After Cleaning the Wall, While Sheryl Draws a
Profile Map at the Sandon Site, Summer Field School 1997 |
 |
Pit N
After Cleaning the Wall at the Sandon Site, Summer Field School 1997 |
 |
Lunch
Break! Julie, Sandy, Stephanie, Sheryl, Anna, Neil and Mike at the Sandon Site,
Summer Field School 1997 |
 |
Still Lunch Showing Richard also at the
Sandon Site, Summer Field School 1997 |
 |
View of East Side of Pit N after Collapse of
South Wall at the Sandon Site, Summer Field School 1997 |